Approximating Scheduling Machines with Capacity Constraints

Abstract

In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most mi jobs. M jobs are also given, where job j has a non-negative processing time length tj >= 0. The task is to find a schedule such that the makespan is minimized and the capacity constraints are met. In this paper, we present a 3-approximation algorithm using an extension of Iterative Rounding Method introduced by Jain. To the best of the authors' knowledge, this is the first attempt to apply Iterative Rounding Method to scheduling problem with capacity constraints.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…