Methods for Accelerating Conway's Doomsday Algorithm (part 2)

Abstract

We propose a modification of a key component in the Doomsday Algorithm for calculating the day of the week of any calendar date. In particular, we propose to replace the calculation of the required term: x12 + x 12 + x 124 with -[ x+11(x 2)2 + 11 (x+11(x 2)2 2)] 7 for a 2-digit input year x; Although our expression looks daunting and complicated, we will explain why it is actually easy to calculate mentally.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…