An efficient algorithm for generating AoA networks

Abstract

The activities, in project scheduling, can be represented graphically in two different ways, by either assigning the activities to the nodes 'AoN' directed acyclic graph (dag) or to the arcs 'AoA dag'. In this paper, a new algorithm is proposed for generating, for a given project scheduling problem, an Activity-on-Arc dag starting from the Activity-on-Node dag using the concepts of line graphs of graphs.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…