Experiences with permanent magnets at the Fermilab recycler ring

Abstract

In order to achieve higher luminosities in Run II a separate antiproton storage ring was built in the Main Injector tunnel. To reduce both construction and operations costs permanent magnets were used. This paper discusses the design criterion and specifications, including temperature dependence, longitudinal uniformity, and adjusting of the higher harmonics of the magnets. The design tolerances for a storage ring are more stringent than for a single pass beam line. The difference between the measured and ideal central field for each magnet was held to better than 0.1%. The temperature stability for all magnets was set to better than 0.01% per degree Celsius. Higher order harmonics relative to the central field were set to less than 0.01%. This was done for all 484 permanent magnet that were built.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…