On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines

Abstract

We consider a special case of the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines, European Journal of Operational Research 221 (2012), 7-13.], the authors presented quadratic algorithm for the problem when each job has its smaller processing time on the first machine. In this note, we improve the running time of the algorithm to O(n log n) by efficient implementation using recently introduced modified binary tree data structure.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…