Implementation and experience with luminosity levelling with offset beam

Abstract

The practice of luminosity levelling with an offset beam has been used as a routine operation in the LHC since 2011. This paper will describe how it has been implemented and what has been the operational experience with the system.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…