Complexity of interval minmax regret scheduling on parallel identical machines with total completion time criterion

Abstract

In this paper, we consider the problem of scheduling jobs on parallel identical machines, where the processing times of jobs are uncertain: only interval bounds of processing times are known. The optimality criterion of a schedule is the total completion time. In order to cope with the uncertainty, we consider the maximum regret objective and we seek a schedule that performs well under all possible instantiations of processing times. Although the deterministic version of the considered problem is solvable in polynomial time, the minmax regret version is known to be weakly NP-hard even for a single machine, and strongly NP-hard for parallel unrelated machines. In this paper, we show that the problem is strongly NP-hard also in the case of parallel identical machines.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…