An Overview of the New Test Stand for H- Ion Sources at FNAL

Abstract

A new test stand at FNAL is being constructed to carry out experiments to develop and upgrade the present magnetron-type sources of H- ions of up to 80 mA at 35 keV in the context of the Proton Improvement Plan (PIP). The aim of this plan is to provide high-power proton beams for the experiments at FNAL. The technical details of the construction and layout of this test stand are presented, along with a prospective set of diagnostics to monitor the sources.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…