The triangle scheduling problem

Abstract

This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the greedy algorithm solves the problem to optimality when the binary tree ratio of the input instance is at most 2. We also show that the problem is unary NP-hard for instances with binary tree ratio strictly larger than 2, and provide a quasi polynomial time approximation scheme (QPTAS). The approximation ratio of Greedy on general instances is shown to be between 1.5 and 1.05.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…