A 2.542-Approximation for Precedence Constrained Single Machine Scheduling with Release Dates and Total Weighted Completion Time Objective

Abstract

We present a e/(e-1)-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The previously best known approximation algorithm dates back to 1997; its performance guarantee can be made arbitrarily close to the Euler constant e.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…