Robust linear control of nonconvex battery operation in transmission systems

Abstract

We describe a robust multiperiod transmission plan- ning model including renewables and batteries, where battery output is used to partly offset renewable output deviations from forecast. A central element is a nonconvex battery operation model which is used with a robust model of forecast errors and a linear control scheme. Even though the problem is nonconvex we provide an efficient and theoretically valid algorithm that effectively solves cases on large transmission systems. Index Terms. Batteries, control, robust optimization.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…