Project Makespan Estimation: Computational Load of Interval and Point Estimates
Abstract
The estimation of project completion time is to be repeated several times in the project planning phase to reach the optimal tradeoff between time, cost, and quality. Estimation procedures provide either an interval or a point estimate. The computational load of several estimation procedures is reviewed. A multiple polynomial regression model is provided for major interval estimation procedures and shows that the accuracy in the probability model for activities is the most influential factor. The computational time does not appear to be an impeding factor, though it is larger for MonteCarlo simulation, so that the computational time can be traded off in search of a simpler estimation procedure.
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.