Quasi-PTAS for Scheduling with Precedences using LP Hierarchies
Abstract
A central problem in scheduling is to schedule n unit size jobs with precedence constraints on m identical machines so as to minimize the makespan. For m=3, it is not even known if the problem is NP-hard and this is one of the last open problems from the book of Garey and Johnson. We show that for fixed m and ε, ( n)O(1) rounds of Sherali-Adams hierarchy applied to a natural LP of the problem provides a (1+ε)-approximation algorithm running in quasi-polynomial time. This improves over the recent result of Levey and Rothvoss, who used r=( n)O( n) rounds of Sherali-Adams in order to get a (1+ε)-approximation algorithm with a running time of nO(r).
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.