Report for the Edinburgh Tram Inquiry
Abstract
This report reviews the Edinburgh tram project's risk management. Projects frequently overrun their cost and timelines and fall short on intended benefits. Cost, schedule, and benefit risk of projects need to be carefully considered to avoid this. The report describes and evaluates risk assessment and management for the Edinburgh tram. The report was produced as part of the Edinburgh Tram Inquiry. Keywords: risk assessment, risk management, infrastructure, megaprojects, optimism bias, strategic misrepresentation, planning fallacy, behavioral science.
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.