Location Planning of Fast Charging Station considering its Impact on the Power Grid Assets

Abstract

Under the ambition of boosting Plug-in Electric Vehicle (PEV) charging speed to a level comparable to the traditional refueling, Fast Charging Station (FCS) has been integrated into power distribution system. The location planning of FCS must allow for satisfactory charging service for PEV users as well as mitigate the detrimental effects on power grid caused by uncertainty and impulsiveness of charging demand. This paper proposed a location planning model for FCS, taking into account its impacts on the critical power grid assets. The multi-objective planning model simultaneously considered the role of FCS in the electricity and transportation sectors. This planning model is solved by the cross-entropy (CE) method. The validity and effectiveness of the CE approach have been demonstrated on a synthetic coupled network.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…