Robust Transmission Network Expansion Planning Problem Considering Storage Units

Abstract

This paper addresses the transmission network expansion planning problem considering storage units under uncertain demand and generation capacity. A two-stage adaptive robust optimization framework is adopted whereby short- and long-term uncertainties are accounted for. This work differs from previously reported solutions in an important aspect, namely, we include binary recourse variables to avoid the simultaneous charging and discharging of storage units once uncertainty is revealed. Two-stage robust optimization with discrete recourse problems is a challenging task, so we propose using a nested column-and-constraint generation algorithm to solve the resulting problem. This algorithm guarantees convergence to the global optimum in a finite number of iterations. The performance of the proposed algorithm is illustrated using the Garver's test system.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…