Case study on scheduling cyclic conveyor belts

Abstract

We optimise the production line of a manufacturing company in southern Germany in order to improve throughput. While the optimisation problem is NP-hard in general, analysing production data we find that in practice the problem can be solved very efficiently by aggressive generation of random machine schedules.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…