A robust optimization and an area decomposition approach to large-scale network planning under uncertainty

Abstract

This paper describes an area decomposition and a robust optimization strategy for the planning of large-scale transmission networks considering uncertainty in variable renewable energy (VRE) and hydropower generation. The strategy is illustrated with a study of Brazil's power grid expansion from 2027 to 2036. The country's network has over 10 thousand buses and 14 thousand circuits and covers an area equivalent to the USA. A clustering scheme based on bus marginal costs is used to decompose the grid into seven regions. Each regional planning is then solved by a heuristic and Benders decomposition methods to produce a robust least-cost plan for 3,000 dispatch scenarios.

0

Discussion (0)

Sign in to join the discussion.

Loading comments…