A Multivariate Complexity Analysis of the Material Consumption Scheduling Problem

Abstract

The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable resources. We focus on the single-machine case without preemption: from time to time, the resources of the machine are (partially) replenished, thus allowing for meeting a necessary pre-condition for processing further jobs, each of which having individual resource demands. We initiate a systematic exploration of the parameterized (exact) complexity landscape of the problem, providing parameterized tractability as well as intractability results. Doing so, we mainly investigate how parameters related to the resource supplies influence the computational solvability. Thereby, we get a deepened understanding of the algorithmic complexity of this fundamental scheduling problem.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…