Closing the gap for single resource constraint scheduling

Abstract

In the problem called single resource constraint scheduling, we are given m identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource R. A schedule of these jobs is feasible if, at each point in the schedule, the number of machines and resources required by jobs processed at this time is not exceeded. It is NP-hard to approximate this problem with a ratio better than 3/2. On the other hand, the best algorithm so far has an absolute approximation ratio of 2+. This paper presents an algorithm with absolute approximation ratio~(3/2+), which closes the gap between inapproximability and best algorithm except for a negligible small~.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…