EPTAS for parallel identical machine scheduling with time restrictions
Abstract
We consider the non-preemptive scheduling problem on identical machines where there is a parameter B and each machine in every unit length time interval can process up to B different jobs. The goal function we consider is the makespan minimization and we develop an EPTAS for this problem. Prior to our work a PTAS was known only for the case of one machine and constant values of B, and even the case of non-constant values of B on one machine was not known to admit a PTAS.
0
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.