A branch and bound technique for finding the minimal solutions of the linear optimization problems subjected to Lukasiewicz

Abstract

In this paper, an optimization model with a linear objective function subject to a system of fuzzy relation equations (FRE) is studied where the feasible region is defined by the Lukasiewicz t-norm. Since the finding of all minimal solutions is an NP-hard problem, designing an efficient solution procedure for solving such problems is not a trivial job. Firstly, the feasible domain is characterized and then the problem is solved with a modified branch-and-bound solution technique based on a new solution set that includes the minimal solutions. After presenting our solution procedure, a concrete example is included for illustration purposes.

0

Turn this paper into a full lesson

ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…