Optimal Operation of HVDC Interconnector: Irish Case
Abstract
In September 2018 EirGrid launched the new electricity market. These new market arrangements integrate the all island electricity market with European electricity markets, making optimal use of cross border transmission assets. Ireland operates three operational HVDC interconnectors: Moyle, East-West, and Greenlink and one in development Celtic interconnector which connect Ireland to Scotland, Wales, and France respectively. Irish market operator, EirGrid, can maximize their operational profit by using the price difference in these electricity markets. We propose a profit maximization modelling which considers the line losses and price difference in these different electricity markets and identifies the optimal import/export of power using HVDC interconnectors. These models in future should incorporate the distribution losses, renewable energy curtailment, and Irish power network congestion levels. The proposed modeling is the first step towards implementing a multi-objective HVDC interconnector operating strategy.
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.