Online and semi-online scheduling on two hierarchical machines with a common due date to maximize the total early work
Abstract
In this study, we investigated several online and semi-online scheduling problems on two hierarchical machines with a common due date to maximize the total early work. For the pure online case, we designed an optimal online algorithm with a competitive ratio of 2. For the case when the total processing time is known, we proposed an optimal semi-online algorithm with a competitive ratio of 43. Additionally, for the cases when the largest processing time is known, we gave optimal algorithms with a competitive ratio of 65 if the largest job is a lower hierarchy one, and of 5-1 if the largest job is a higher hierarchy one, respectively.
Turn this paper into a lesson
ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.