Heuristic Solutions to the Single Depot Electric Vehicle Scheduling Problem with Next Day Operability Constraints

Abstract

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. A case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…