Production optimization by agents of differing work rates
Abstract
We devise a scheme for producing, in the least possible time, n identical objects with p agents that work at differing speeds. This involves halting the process in order to transfer production across agent types. For the case of two types of agent, we construct a scheme based on the Euclidean algorithm that seeks to minimise the number of pauses in production.
0
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.