Design of the LLRF control system for MA cavity at CSNS RCS
Abstract
The China Spallation Neutron Source (CSNS) beam power was successfully reached 125 kW with a low beam loss in February 2022. In order to increase beam power, during the summer in 2022, we employ magnetic-alloy (MA) cavity in the rapid cycling synchrotron (RCS). It is a wideband cavity (Q=2), allows the second harmonic rf (h= 4) operation, with the existing ferrite cavity to realize the dual-harmonic acceleration. The second harmonic (h=4) is used for the bunch shape control and alleviating the space charge effects. We design of the low-level RF(LLRF) control system for MA cavity, in this paper, we describe the system design and implementation, and the preliminary test results.
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.