Leveraging P90 Requirement: Flexible Resources Bidding in Nordic Ancillary Service Markets

Abstract

The P90 requirement of the Danish transmission system operator, Energinet, incentivizes flexible resources with stochastic power consumption/production baseline to bid in Nordic ancillary service markets with the minimum reliability of 90%, i.e., letting them cause reserve shortfall with the probability of up to 10%. Leveraging this requirement, we develop a distributionally robust joint chance-constrained optimization model for aggregators of flexible resources to optimize their volume of reserve capacity to be offered. Having an aggregator of electric vehicles as a case study, we show how distributional robustness is key for the aggregator when making bidding decisions in a non-stationary uncertain environment. We also develop a heuristic based on a grid search for the system operator to adjust the P90 requirement and the level of conservativeness, aiming to procure the maximum reserve capacity from stochastic resources with least expected shortfall.

0

Turn this paper into a full lesson

ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…