Bicriteria approximation for minimum dilation graph augmentation
Abstract
Spanner constructions focus on the initial design of the network. However, networks tend to improve over time. In this paper, we focus on the improvement step. Given a graph and a budget k, which k edges do we add to the graph to minimise its dilation? Gudmundsson and Wong [TALG'22] provided the first positive result for this problem, but their approximation factor is linear in k. Our main result is a (2 [r]2 \ k1/r,2r)-bicriteria approximation that runs in O(n3 n) time, for all r ≥ 1. In other words, if t* is the minimum dilation after adding any k edges to a graph, then our algorithm adds O(k1+1/r) edges to the graph to obtain a dilation of 2rt*. Moreover, our analysis of the algorithm is tight under the Erdos girth conjecture.
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.