BEPCII and CEPC
Abstract
In this paper BEPC, BEPCII and BEPCII-U have been briefly reviewed, which lay a good foundation of CEPC as a Higgs factory. BEPCII reached the designed luminos-ity goal of 1033cm-2s-1 @1.89GeV on April 5, 2016. As an upgrade program of BEPCII, BEPCII-U has been com-pleted and started commissioning in March of 2025 with the luminosity goal as 3.7*1032cm-2s-1 @2.8GeV. CEPC as Higgs factory has been reviewed on Engineering De-sign Report (EDR) status and plan for construction proposal to Chinese government in 2025.