On scheduling coupled tasks with exact delays to minimize maximum lateness

Abstract

This paper studies scheduling coupled tasks with exact delays to minimize maximum lateness. The first task has processing time p>0 and the second bi≥ 0, also the second needs to start exactly p units of time after the completion of the first. The couple has due date di. The tasks are scheduled on a single machine to minimize maximum lateness. The problem has been left open in the literature which offer hardly any results on scheduling coupled tasks with exact delays to minimize maximum lateness. The paper shows polynomial time algorithms for agreeable (di≥ dj implies bi≥ bj) and disagreeable (di≥ dj implies bi≤ bj) cases. The complexity of the general problem remains open.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…