Solution of a bilevel optimistic scheduling problem on parallel machines
Abstract
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while the follower seeks to minimize the total completion time on a set of uniform machines. This problem has practical applications in Industry 4.0. We show that this problem is NP-hard in the strong sense by providing a reduction from the Numerical 3-Dimensional Matching problem and we provide a moderately exponential-time dynamic programming algorithm. The problem is solved by means of a concise MIP formulation and a branch-and-bound algorithm that embeds a column generation approach for the lower bound computation. Computational experiments are presented for instances with up to 80 jobs and 4 machines while larger problems are out of reach for the proposed approaches.
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.