Preemptive Multi-Machine Scheduling of Equal-Length Jobs to Minimize the Average Flow Time

Abstract

We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal schedule can be computed in polynomial time by solving a linear program with O(n3) variables and constraints, followed by some substantial post-processing (where n is the number of jobs.) In this note we describe a simple linear program with only O(mn) variables and constraints. Our linear program produces directly the optimal schedule and does not require any post-processing.

0

Turn this paper into a full lesson

ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…