Towards Reliable Acceleration of High-energy and High-intensity Electron Beams
K. Furukawa, Linac Commissioning Group
Abstract
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 1010) per bunch up to 3.7-GeV for positron generation. This could be classified as one of the brightest S-band linac's. Since the KEKB rings were completed in December 1998, those 3.5-GeV position and 8-GeV electron beams have been injected with an excellent performance. Moreover, we have succeeded in switching among the high-intensity beams for KEKB and beams for two SOR rings with sufficient reproducibility. After the commissioning of the KEKB ring started, we have launched a project to stabilize the intensity and quality of the high-current beams furthermore, and have accomplished it investigating every conceivable aspect.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly