Performance of the Cathode Strip Chamber endcap muon detectors in Run 2

Abstract

Since the end of Run 1 of the LHC in 2012, the outermost ring has been added to the CMS Cathode Strip Chambers (CSC) endcap muon detector, and the readout electronics of the innermost ring of CSCs have been upgraded to accommodate the larger luminosity and collision energy anticipated in Run 2. A major effort was required to build, install, and commission these new chambers and electronics. This talk summarizes the improvements made during this upgrade and presents the performance of the CSC detector during the early stages of Run 2.

0

Turn this paper into a lesson

ArcXiv compiles a structured reading guide from this paper's metadata: plain-English importance, contributions, prerequisite concepts, which sections to read first, flashcards, and a quiz. Grounded in the abstract, never invented.

Discussion (0)

Sign in to join the discussion.

Loading comments…