Triple-GEM detectors for the Phase-2 upgrade of the CMS muon spectrometer
Abstract
The High-Luminosity LHC will deliver an unprecedented instantaneous luminosity, requiring all experiments to upgrade their detectors to sustain the higher background rates. The upgrade of the CMS Muon spectrometer includes three stations of triple-GEM detectors. We present the status of the commissioning and performance validation of the three GEM stations: GE1/1, which is taking data in Run 3, GE2/1, for which the first detectors will be installed in 2024, and ME0, which has undergone several performance studies for high-rate and longevity and will start its mass production in 2024.
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.