Graph Scheduling with Group Completion Times
Abstract
In the Graph Scheduling problem we schedule a given multiset of edges on discrete time steps, such that at each step the set of edges forms a matching. The goal is to minimize the sum of weighted group completion times, where a group is a set of edges and it completes when the last edge has been scheduled. Two popular variants of this problem are Coflow Scheduling and Data Migration. Our main result is extending a recent iterated rounding approach from Coflow Scheduling, roughly corresponding to the bipartite case, to the general Graph Scheduling problem. This yields an essentially tight -approximation for the asymptotic setting where OPT is assumed to be large. For this we rely on polyhedral techniques from general matching, namely odd-set inequalities, and graph theoretical results on edge colorings in multigraphs. The state-of-the-art approximation algorithm for Data Migration is a -approximation that improves when OPT is small. Taking the best of this and our main result, we obtain an improvement of the approximation rate for Data Migration in any regime.
Create a lesson
Metadata
- Categories
- cs.DS, math.OC
- Comments
- 22 pages
Related papers
Speed-Robust Scheduling for Total Completion Time
Shared title terminologycs.DSMoritz Buchem, Nicole Megow, Morten Weber
Scheduling with Testing: Competitive Algorithms for Minimizing the Total Weighted Completion Time in the Adversarial Model
Shared title terminologycs.DSFelix Buld, Andreas S. Schulz
A Polynomial-Time Algorithm for Coloring Perfect Graphs Based on Walk Counting
Shared title terminologycs.DSAmir Ali Ahmadi, Pravesh K. Kothari, Yukai Tang
Real-weighted Diameter and Eccentricity of Minor-free and Bounded VC-dimension Graphs in Truly Subquadratic Time
Shared title terminologycs.DSDa Wei Zheng
Near-Linear Time Generalized Sinkhorn Algorithms for Bounded Genus Graphs
Shared title terminologycs.DSKrzysztof Choromanski, Derek Long, Ananya Parashar et al.
Real Time Proportional Throughput Maximization: How much advance notice should you give your scheduler?
Shared title terminologycs.DSNadim A. Mottu