Determining stress-based bending mode limits for the Vera C. Rubin Observatory M1M3 active mirror system
Malhar Sonaniskar, Douglas Neill, Ellie Hileman, Petr Kubánek
Abstract
The Vera C. Rubin Observatory Simonyi Survey Telescope's primary-tertiary mirror (M1M3) is an actively supported, 8.4-m cast borosilicate optic controlled by 156 pneumatic actuators. This work presents a rapid stress-estimation methodology based on the root-sum-square (RSS) combination of Finite Element Analysis to derive pre-computed unit bending mode stresses. Since the stress is proportional to strain, and strain is proportional to displacements, we theorized that since the bending mode displacements can be combined RSS, that the peak stresses would also combine by RSS. We validate the RSS-based major principal stress predictions against NASTRAN simulations for representative bending mode combinations, demonstrating agreement within a few percent for peak Principal major stress across the mirror glass substrate. Unit displacement and corresponding unit stress fields for the first 20 natural bending modes of the M1M3 system are generated using NASTRAN. Representative multi-mode corrections including combinations that include astigmatism, coma, and spherical modes of higher order are then analyzed to compare the resulting peak principal stresses with RSS-based predictions. The method enables near instantaneous evaluation of stress margins for active optics corrections, safety-limit checking, and actuator-force optimization during telescope operations. This paper outlines the formulation, implementation workflow, validation results, and practical use cases for integrating RSS-based stress prediction into the Vera C. Rubin Observatory's M1M3 active optics system.
Create a lesson
Related papers
The filter exchange system of the LSSTCam at the Vera C. Rubin Observatory
Shared title terminology · Alexandre Boucaud, Pierre Antilogus, Éric Aubourg et al.
Laser-based metrology systems vs wavefront sensing techniques: a comparative overview between the Large Binocular Telescope and the Vera C. Rubin Observatory for the telescope alignment and collimation tracking
Shared title terminology · Luca Rosignoli, Gabriele Rodeghiero, Sandrine J. Thomas et al.
Early Telescope Throughput Results from the Collimated Beam Projector at the Vera C. Rubin Observatory
Shared title terminology · Nathan Amouroux, Parker Fagrelius, Thibault Guillemin et al.
The Rubin Observatory Target-of-Opportunity System in the First Year of Operations
Shared title terminology · Sean Patrick MacBride, R. Lynne Jones, Peter Yoachim et al.
Test Management and Coordination During the Vera C. Rubin Observatory Commissioning and Early Operations Using Zephyr Scale
Shared title terminology · Bruno Quint, Tiago Ribeiro, Erik Dennihy et al.
Modeling of the diffuse background produced by the Vera C. Rubin Observatory M2 baffle scattered light
Shared title terminology · Alessio Taranto, Gabriele Rodeghiero, Luca Rosignoli et al.