Hidden Economic Consequences of Adapting to Fast Ramping Datacenter Loads
Willa Gutowski, Charles Foltz, Nicholson Koukpaizan, Slaven Peles, Eve Tsybina
Abstract
Artificial intelligence workloads are driving the rapid expansion of datacenter infrastructure, which imposes substantial stress on the US energy system. While high peak electricity prices are an anticipated outcome, measurable under peak hour simulations, the high off peak prices are a significantly underestimated threat. We simulate different ramping conditions on a congestible 5000-bus system, based on a modified IEEE 118-bus grid, to show that, in the presence of fast ramping loads and slow ramping generation, datacenters can aggravate latent load pockets. This results in unexpectedly high system costs during periods outside of datacenter peak. We test the datacenter effects using two distinct load conditions. We find that in the system coincident peak, coupled simulations result in up to 100% loading of slow expensive units, with an average marginal cost increase of 8%. These findings are of extreme importance as they reveal the hidden costs of preventively ramping slow generation in anticipation of datacenter load changes.
Create a lesson
Metadata
- Categories
- eess.SY, cs.SY
- Comments
- 5 pages, 5 figures, 1 table
Related papers
Smoothing the Ramp, Not the Peak: Scheduling-Induced Power Dynamics of LLM Inference and Their Grid-Scale Consequences
Shared title terminologyeess.SYPan Li, Yize Chen, Xia Miao et al.
Adaptive Demand-Driven Energy Management of PCM-Integrated District Heating Systems: Operational Flexibility and Techno-Economic Assessment
Shared title terminologyeess.SYXin Jin, Chunjun Huang, Pei Huang et al.
Adaptive Control Barrier Functions for Nonlinear Singularly Perturbed Systems
Shared title terminologyeess.SYPrashanth Krishnamurthy, Farshad Khorrami
Adaptive Electromagnetic Transient-level Digital Twins for Data Centers via In-Context Learning with LLMs
Shared title terminologyeess.SYAmit Jena, Bin Wang, Aoxia Chen et al.
Adaptive Robust Optimisation for Frequency-Constrained Market Clearing Problem
Shared title terminologyeess.SYÖzlem Mahmutoğulları, Hakan Ergun
Data Center-Aware Load Pickup in Power System Restoration
Shared title terminologyeess.SYYousef Abudyak, Saleh Sadeghi Gougheri, Mohsen Alizadeh et al.