Abstract
We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading operations. We prove that the decision problem is NP-complete for every fixed server-operation duration and strongly NP-complete when this duration is part of the input. We then analyse ordinary list scheduling and the longest-processing-time rule in the non-unit setting. List scheduling has a tight supremum ratio of two. For the longest-processing-time rule, we obtain the exact worst-case ratio when all processing times are at least the server-operation duration, and derive new parameter-dependent lower and upper bounds for unrestricted instances. The results show that both processing-time granularity and blocking generated by short jobs shape the approximation behaviour of the common-server problem.
Create a lesson
Related papers
A Near-Optimal Space Lower Bound for Euclidean Diameter Estimation in Dynamic Streams
Ashwin Padaki, Krish Singal, Erik Waingarten
A Walk From Free Probability to Matrix Discrepancy I: Matrix Spencer
Tarun Kathuria
A Walk From Free Probability to Matrix Discrepancy II: Weaver's Problem and the Kadison-Singer Conjecture
Tarun Kathuria
Degree-Free Spectral Independence for Log-Concave Holant Measures
Xiaoyu Chen, Zejia Chen, Xinyuan Zhang
Optimizing Both Checking and Update Costs in Random Walk Search
Simon Apers, Marin Costes
Routing Multiple Agents Below the Sum of Distances
Matthias Bentert, Eduard Eiben, Fedor V. Fomin et al.