Shift or curtail? How much data-center flexibility is worth depends on the host power grid
Saroj Khanal, Geon Roh, Boyu Yao, Abraham Silverman, Dennice Gayme, Charalambos Konstantinou, Jip Kim, Yury Dvorkin
Abstract
Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.
Create a lesson
Related papers
Towards stratified sampling for redistricting plans
Zijian Wang, Gregory J. Herschlag, Joon-Hyeok Yim et al.
BanglaShop-CRS: A User-Centric Bangla Dataset for Conversational Recommendation
Tabia Tanzin Prama, Christopher M. Danforth, Peter Sheridan Dodds
Ensuring proportionality: a logical model for compensatory seats added to multi-member constituencies
Frederik Ravn Klausen
Modelling opinion dynamics during crises as complex contagion with feedback
Junxiang Huang, Mikhail Prokopenko
Topological Uncertainty and Higher-Order Interactions in Spatial Networks
Domenico Pomarico, Alessandro Fania, Gabriel Ramirez Sanchez et al.
Shannon entropy and complex network community detection to study electoral coalition behaviour at municipal scale
Andrea Lo Sasso