Real-Time Operation Strategy of Virtual Power Plants With Optimal Power Disaggregation Among Heterogeneous Resources
Qixin Chen, Ruike Lyu, Hongye Guo, Xiangbo Su
Abstract
The virtual power plant (VPP) can aggregate flexible resources on the demand side to provide frequency regulation for the grid, helping address the supply-demand balance challenges. When deploying regulation, the VPP disaggregates the requested power adjustment in real time among its internal heterogeneous resources. Achieving optimal power disaggregation in this process is challenging due to the temporal coupling characteristics of the resources, the uncertain regulation signals, and the requirement for fast response. Therefore, existing research relies on heuristic methods, such as proportional disaggregation, and fails to leverage the heterogeneity of multiple resources. Here, we propose an optimal operation strategy for VPPs to provide regulation, exploiting the complementary characteristics of heterogeneous resources by prioritizing the use of low-cost resources while considering temporal coupling. To reduce the computational overhead of online deployment, we further propose a fast disaggregation algorithm to eliminate the reliance on optimisation solvers. We conducted case studies on the operation of a VPP composed of resources including thermostatically controlled loads and industrial production processes. The results verified the reduced operation cost and increased profit of the VPP under the proposed strategy, with only milliseconds of online computation time. We believe that our work can help better exploit demand-side flexibility.
Create a lesson
Related papers
Leader-Follower Formation Control with Prescribed Convergence Rates under Bearing Persistence of Excitation
Tarek Bouazza, Zhiqi Tang, Soulaimane Berkane et al.
On asymptotic stability of the time-varying Kalman filter for unstabilizable linear systems: an optimization perspective
James B. Rawlings, Titus Quah, Matthias A. Müller
Designing Grid-Aware Dynamic Specifications for Large Data Center Loads
Ashutossh Gupta, Vassilis Kekatos
Time-Optimal Operation of a Load-Hoisting Gantry Crane
Eric Mountain, Tarunraj Singh
Learning to Solve Two-Stage Stochastic Unit Commitment Problems with Quality Guarantees
Andrea Fusco, Andrea Lodi, Lavanya Marla
Towards Interaction Regulation from Human Feedback via Free Energy Minimization
Maria Paula Diaz Monfort, Cinzia Tomaselli, Michael Richardson et al.