An FPTAS for Two-Machine Open-Shop Scheduling with a Single Unavailability Interval
Abstract
We consider the two-machine open-shop scheduling problem in which one machine is unavailable during a fixed interval. We study the resumable setting: an operation interrupted by the unavailability interval may resume, without penalty, when the machine becomes available. The objective is to minimize the makespan. Although the problem is NP-hard and several approximation algorithms are known, whether it admits a fully polynomial-time approximation scheme (FPTAS) has remained open for two decades. We resolve this question affirmatively by giving the first FPTAS, thereby strengthening the previously known polynomial-time approximation scheme (PTAS). As an intermediate result, we develop a new pseudo-polynomial dynamic program with seven state dimensions, improving on the ten-dimensional formulation in the literature.
Create a lesson
Related papers
Two-Machine Flow Shop with a Fixed Non-Availability Interval on the Second Machine
Shared title terminologycs.DMHao Lu, Yuan Yuan, Xingwu Liu et al.
Minimizing the makespan in job shop scheduling under conflict graph constraints
Shared title terminologycs.DMNour Elhouda Tellache, Abdenour Azerine
Maximum Edge Open Packing in Permutation, Interval, and Well-Partitioned Chordal Graphs
Shared title terminologycs.DMGautam K. Das, Kamal Santra
A Simple Computer-Assisted Proof of the 5/6-Bound for Real-Period Pinwheel Scheduling
Shared title terminologycs.DMHiroshi Fujiwara, Grzegorz Gutowski, Katsuhisa Ouchi et al.
Partial Interval Multicover Is NP-Complete Even for Unit Intervals
Shared title terminologycs.DMMingchao Zhou, Yingli Ran, Lei Zhao et al.
Maximum Edge Open Packing on AT-Free, Chordal, and Convex Bipartite Graphs
Shared title terminologycs.DMGautam K. Das, Kamal Santra