PIP-II Project Progress and Challenges
O. Napoly
Abstract
The Proton Improvement Plan-II (PIP-II) project is under construction to provide the Fermilab Accelerator Complex with a new H- superconducting radiofrequency (SRF) linac and beam transfer line delivering 800 MeV protons at Booster injection at double energy and double intensity (6.7x1012 protons per 20 Hz pulse) in comparison with the present Linac. The design goals of PIP-II Linac will be described, including delivering 1.2 kW beam power on Long Baseline Neutrino Facility (LBNF) target, continuous wave (CW) operation compatibility and future upgrades. The progress of the Linac construction and the development of the Commissioning Plan will be presented. Finally, the challenges of operating the SRF Linac to drive the Fermilab Booster will be addressed.
Create a lesson
Related papers
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
Implementation of a 300 kA Pulsed Power Supply
C. C. Jensen, N. Gurley, H. Pfeffer
A 20kA 0.12% Pulsed Power Supply for the PIP-II ORBUMP Injection Dipole Magnets
H. Pfeffer, M. Davidson, D. West et al.