FissionReady: Joint Workload and Power Scheduling for Data Centers Powered by Small Modular Reactors
Raghavendra Kanakagiri, Rohan Basu Roy, Yankai Jiang, Pranathi Wuppuluru, Devesh Tiwari
Abstract
Data centers are increasingly exploring small modular nuclear reactors (SMRs) as a carbon-free power source, but variable datacenter demand and negative grid prices require the SMR plant to load-follow rather than run at constant output. Load following is uniquely challenging and complex for SMR plants due to underlying nuclear physics. We propose FissionReady, a datacenter scheduler that tracks each module's fuel age, xenon state, and remaining flexibility to determine per-module operating envelopes, then coordinates load-following, batch deferral, and grid purchasing through a two-timescale optimization. FissionReady achieves zero involuntary shutdowns and zero batch deadline misses while reducing water consumption by roughly one-third and grid cost by roughly half compared to a same-sized base configuration.
Create a lesson
Related papers
Capturing Electrical Windows Through Reconfigurable Optical Networks: Transfer-aware Scheduling of Multi-Region AI Data Centers
Shared title terminology · Xi Tong, Zijian Li, Xiaoyi Fan et al.
GNoF: A Low-SM-Overhead GPU-Native NVMe-over-Fabrics Completion Path for Data-Intensive GPU Workloads
Shared title terminology · Lei Tian, Wenhao Gu
ForeSpark: Joint Draft and Verification Budget Scheduling for Parallel Speculative Decoding
Shared title terminology · Jaeyong Song, Daniel Wang, Pratyush Patel et al.
StageBreaker: Shifting Video RL Post-Training Scheduling from Stages down to Data Dependencies
Shared title terminology · Li Peng, Chenghuan Huang, Ziyang Ma et al.
Vesta: Queueing-Aware LLM Scheduling for Real-World Workloads
Shared title terminology · Lancheng Zou, Bowen Li, Wei Mao et al.
Execution-Feasible Dispatch of LLM Pre-training Loads for Renewable-Dominant AI Data Centers
Shared title terminology · Xi Tong, Ershun Du, Haiyang Jiang et al.