Skip to content

Monge matrix searching for lot sizing with piecewise-concave production costs

Kleitos Papadopoulos

cs.DS

Abstract

We study single-item lot sizing with piecewise-concave production and holding--backlog costs over TT periods. Production has mm common positive finite breakpoints, and stock costs and domains have KK common finite boundary levels. For fixed m,Km,K, we give an exact deterministic algorithm using \OmK(Tm+2α(T+2))\OmK(T^{m+2}α(T+2)) arithmetic operations and a Las Vegas algorithm using \OmK(Tm+2)\OmK(T^{m+2}) expected operations, where αα is the inverse Ackermann function. The algorithms retain nonlinear concave cost pieces and cover backlogging, common-grid stock limits, and explicit terminal-stock policies. A structural decomposition at stock boundary levels yields breakpoint-only prefix and suffix tables. Batching transitions by a designated production period produces implicit matrices that are Monge double staircases on each production piece. Established matrix searches, merged state orders, and backward evaluation provide the bounds. A simpler rectangle/SMAWK variant requires \OmK(Tm+2log⁡(T+2))\OmK(T^{m+2}\log(T+2)) operations. On 300 no-backlogging benchmark cases, its objectives agree exactly with the predecessor dynamic program and an inventory-state oracle. Geometric-mean paired time ratios are \GeoUncap\ for uncapacitated cases and \GeoCap\ for capacitated cases, with ratios above one favoring matrix searching. A 640-case base-model validation suite and a separate 624-case generalized-model suite pass. The timing study does not benchmark the generalized models or the stronger staircase routines. All bounds assume exact arithmetic, constant-time cost queries, and explicit closed-domain concavity conditions.

Create a lesson