Solving Distributed Flexible Job Shop Scheduling Problem Using SAT

Phuong Dang Anh, Duc Nguyen Kim Trung, To Van Khanh

cs.LOarXiv:2610.14749

Abstract

The Distributed Flexible Job Shop Scheduling Problem (DFJSP) requires the joint determination of factory assignment, machine selection, and operation sequencing to minimize the makespan. This paper presents an exact SAT-based approach built on an efficient SAT formulation that exploits problem structure through propagation, symmetry breaking, and incremental SAT solving to effectively address these coupled decisions. The proposed method is evaluated on 76 standard benchmark instances from the Fattahi, Brandimarte, and rdata datasets under two- and three-factory configurations. Together with previously established results, the new SAT optimality certificates bring the total number of proven-optimal instances to 72 out of 76, including three newly certified instances; for two of these instances, SAT also improves the previous best-known makespans. Across the benchmark configurations, SAT achieves the best results on four of the five configurations and remains competitive with strong exact approaches such as CP and LBBD1CPIL, as well as existing metaheuristic methods. These results demonstrate that the proposed SAT framework is an effective exact approach for the DFJSP, combining strong solution quality with rigorous optimality certification and offering a complementary exact method for future DFJSP studies and evaluations on additional benchmark instances.

Create a lesson