Feeder-Aware Service-Conditioned Flexibility of Grid-Interactive Buildings
Abstract
Grid-interactive buildings can adjust demand, but building-feasible power budgets may differ from accepted feeder-head offers. This study addresses a practical question: to what extent can the adjustable electricity consumption of buildings be translated into deliverable flexibility services while satisfying feeder-head operating requirements? To enable a fair comparison, we adopt the same baseline operating schedule, equipment conditions, and post-service recovery requirements for indoor temperature and battery state of charge (SOC). Flexibility is then evaluated under two settings: one considering only building-level constraints, and the other additionally accounting for feeder-head constraints. We first use a simplified network model with explicit security margins to determine a preliminary amount of flexibility that can be committed. The resulting schedule is then validated using a more detailed network simulation via Modelica. If network losses cause the actual response to deviate from the committed response, the electricity consumption of individual buildings is rescheduled. If the required response still cannot be achieved, the committed flexibility level is reduced. The experiments cover multiple service activation times, regulation directions, and service durations. For comparative purposes, we retain the initial optimization result as the reference estimate of the maximum potentially available flexibility, rather than interpreting the failure of a particular subsequent realization attempt as evidence that a larger flexibility level is inherently infeasible. The results demonstrated that 24.51\% of nonzero flexibility contracts were rejected due to feeder-head constraints, 67.04\% of contracts were accepted with some rescheduling and building redispatch, and only 8.09\% of contracts were accepted without any changes.
Create a lesson
Metadata
- Categories
- eess.SY, cs.SY
Related papers
A Dynamic Model and Stability Analysis of a Grid-Interactive Data Center
Shared title terminologyeess.SYAdvith Natarajan, Xinyang Zhou, Guido Cavraro
Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines
Shared title terminologyeess.SYRajkumar Silwal, Shambhu Marasini, Bo Tu
Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility
Shared title terminologyeess.SYEihab E. E. Ahmed, Saeed Manshadi
Water as a Battery: Using Hydropower Flexibility to Support the Grid
Shared title terminologyeess.SYChinmay Morankar, Abdullah Al Mehadi
Spatial-Frequency Control Authority of Grid-Forming Inverters over Voltage Waveforms in Distribution Feeders
Shared title terminologyeess.SYAmir H. Abolmasoumi, Hamed Mohsenian-Rad
Exploiting the Flexibility of LLM Inference for Frequency Regulation Service
Shared title terminologyeess.SYYimeng Sun, Zhaohao Ding