Skip to content

A Linear-Time Construction on S2\mathbb{S}^2 Achieving a Sublinear Energy Gap on Smale's Seventh Problem

Rishabh Kabra, Wim Dehaen, Andrea Karlova, Mark Hamilton, Joao Carreira, Maks Ovsjanikov, Jonathan T. Barron

cs.CG

Abstract

Smale's seventh problem asks for a polynomial-time algorithm that places NN points on the unit sphere S2\mathbb{S}^2 with logarithmic energy (the sum of −log⁡-\log of all pairwise distances) within O(log⁡N)O(\log N) of the minimum. The minimal energy has an asymptotic expansion with explicit terms of order N2N^2 and Nlog⁡NN\log N and a linear term whose constant is unknown. Brauchart, Hardin, and Saff conjectured this constant; the resulting expansion, EBHS(N)E_{BHS}(N), is known to be an upper bound on the minimum, up to o(N)o(N). All previously analyzed constructions on S2\mathbb{S}^2 have energy exceeding EBHS(N)E_{BHS}(N) by an amount that grows at least linearly in NN, i.e. Ω(N)Ω(N), far from the O(log⁡N)O(\log N) accuracy sought by Smale. We present TerracedZonal, a deterministic construction that generates NN points in Θ(N)Θ(N) time and memory. Points are placed on latitude rings whose populations are held constant across bands ("terraces") chosen by a one-dimensional dynamic program, so that adjacent rings within each terrace lock into a staggered triangular lattice. Under a locality assumption, we prove that the energy exceeds EBHS(N)E_{BHS}(N) by only Θ(N2/3)Θ(N^{2/3}), with an explicit constant; exact evaluation up to N=109N = 10^9 confirms this rate. Under the same assumption, its distance from the true minimum is sublinear if the conjecture holds. To our knowledge, this is the first algorithmic construction with a sublinear excess over EBHS(N)E_{BHS}(N) of explicit order (proven under the locality assumption), a necessary step toward Smale's seventh problem. With one parameter changed, the same algorithm also gives an equal-weight integration rule on S2\mathbb{S}^2 that runs just as fast and whose error decays at an empirical rate of N−4N^{-4} on smooth functions, versus N−3/2N^{-3/2} for every previous fast construction we tested.

Create a lesson

Metadata

Categories
cs.CG, math.MG