Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache
Abstract
We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories. We study dominance properties of the sets of schedules obtainable with each SGS. We show how the proposed SGSs can be used within single-pass and multi-pass priority rule based heuristics. We study several priority rules for the problem and provide a comparative computational analysis of the different SGSs on sets of instances taken from the literature. The proposed SGSs significantly improve previously best-known results on a set of hard benchmark instances.
Create a lesson
Related papers
Pseudodeterminism and MA != NPBPP in Communication Complexity
Thomas Watson
Group Isomorphism and the Polylogarithmic-Time Hierarchy: Depth-212 Circuits and Lower Bounds
Joshua A. Grochow, Gülce Kardeş, Michael Levet
Continuous Computational Social Choice: A Case Study in Bribery
Martin Koutecký, Nikolaos Melissinos, Tung Anh Vu et al.
Pseudorandom Functions in NC1 from LWE/LPN/CDH (Or: How to Build PRFs in NC1, Generically)
Youlong Ding, Aayush Jain, Ilan Komargodski
Parameterized Complexity of Lp-Lipschitz Constants for Input Convex Neural Networks and Lp-Norm Maximization over Zonotopes
Aritra Das, Vincent Froese, Moritz Grillo et al.
Exact CVP Is NP-Complete for Principal Cyclotomic Ideals
Jiaqi Liu, Yansong Feng, Yanbin Pan